Put into use Storage of hazardous waste

July 28, 2015 Long Jiang IPD Co.,Ltd  was taken over and put into use the Storage of hazardous waste. This storage is located at the wastewater treatment plant with area of 80 m2. Inside the storage, it is divided into separate areas for collecting garbage is convenient and preventing hazardous waste from dispersal into the surrounding environment. 

Please publish modules in offcanvas position.

thiết kế thi công gian hàng hội chợ triển lãm
thiet ke thi cong gian hang hoi cho trien lam
exhibition booth contractor in vietnam
phan mem quan ly khu cong nghiep
phần mềm quản lý khu công nghiệp
phan mem quan ly tinh dien nuoc
phần mềm quản lý tính điện nước
giai phap bigdata
giải pháp bigdata