In the morning of March 10, 2017, Vice Prime Minister Trinh Dinh Dung lead a delegation to make a field trip of Trung Luong - My Thuan - Can Tho highway. This is an essential highway for the development of Delta Mekong. He directed relevant departments to complete the highway in 2019.

When it is completed, a connection point from highway to Long Jiang IP shall be a convenient condition of traffic for enterprises in Long Jiang IP.

 Phó Thủ tướng Trịnh Đình Dũng Phải hoàn thành cao tốc Trung Lương Cần Thơ vào năm 2019 1

Vice Prime Minister made a field trip of Trung Luong - My Thuan - Can Tho highway

 Phó Thủ tướng Trịnh Đình Dũng Phải hoàn thành cao tốc Trung Lương Cần Thơ vào năm 2019 2

Vice Prime Minister emphasized 4 main criteria of Trung Luong - My Thuan - Can Tho highway: Progress, Safety, Quality, Effect

In the morning of April 18, 2017, Vice Prime Minister and Minister of Foreign Affairs Pham Binh Minh had a meeting with Chinese Minister of Foreign Affairs Vuong Nghi on the occasion of 10th meeting in China of Vietnam and China bilateral Guidance Commitee.

Vice Prime Minister and Minister Pham Binh Minh highly appreciated closely cooperation between two Foreign Affairs Ministries in coordinating the relationship of two countries on all fields. It is suggested for two sides to prove standing agency’s role of Vietnam - China bilateral guidance Commitee.

Mr. Vuong Nghi - Chinese Foreign Affairs Minister totally appreciated and agreed with Mr. Pham Binh Minh’s opinion on development of two countries; he also affirmed that he and Vietnam Foreign Affairs are  ready for visits and promotes the cooperation relationship between two countries.

Việt Nam Trung Quốc thúc đẩy quan hệ đối tác hợp tác chiến lược toàn diện

Vice Prime Minister and Foreign Affairs Minster Pham Binh Minh and Foreign Affairs Minister Vuong Nghi

On March 18th 2017Bellinturf Industrial (Vietnam) Co.,Ltd in Long Jiang Industrial Park held a formal groundbreaking ceremony. In the ceremony, there were Mr Pham Anh Tuan – Deputy Chairman of the Provincial People’s Committee, presence of representatives of enterprises and agencies in Tien Giang.The first stage, total capital of this project is USD 45 Milllion and area is 10ha,specializes in production artificial fiber, artificial grass cover.

After operating, Bellinturf Industrial (Vietnam) Co.,Ltd will contribute to improve the local socio-economic development.

On March 17, 2017 Vietnam Balala Food Co.,Ltd was issued the Investment Certificate no. 5420322166 by TIZA. The Project of  Petpal Pet Nutrition Technology Co., Ltd investor is located at lot 27B in Long Jiang IP with total capital USD 2.000.000 and area of 4.393,4 m2. It manufactures and preserves products from meat and aquatic. It is expected for Balala Vietnam to operate in November 2017 and contribute to the local socio-economic development.

On March 17, 2017 JinTian Copper Industrial (Vietnam) Co.,Ltd was issued the Investment Certificate no. 6540538183. The Project of NingBo JinTian Copper (Group) Co.,Ltd is located at lot 110A, 110B, 110C and 110D in Long Jiang IP with area of 100.000 m2 and total capital USD 41.580.000. It manufactures products color metal, copper pipe, connection point. It is expected to contribute to the local socio-economic development.

Please publish modules in offcanvas position.

thiết kế thi công gian hàng hội chợ triển lãm
thiet ke thi cong gian hang hoi cho trien lam
exhibition booth contractor in vietnam
phan mem quan ly khu cong nghiep
phần mềm quản lý khu công nghiệp
phan mem quan ly tinh dien nuoc
phần mềm quản lý tính điện nước
giai phap bigdata
giải pháp bigdata